Polk Rd Project

This project was done on Polk Rd in Hart, MI. There was a lip in the road that needed repair. The asphalt was drilled, cleaned, and filled with 4Seasons Pothole Filler, using the OSS machine. This repair took approximately 15 minutes. After the filler hardened, traffic was able to resume as normal. 

 

1/11

© 2023 by Sphere Construction. Proudly created with Wix.com

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • Google+ - Grey Circle